SKU :1094
Tersedia
Harga sudah termasuk PPN 10%
Technical Parameters
Stem bending performance measurement area: 0.5cm2
Stem compressive strength measurement area: 1cm2
Stem structure intensity measurement: 1mm²
Max Load: 500N (N, kg, it can be transformed automatically)
Resolution: 0-1N
Precision: ±0.5%FS
Power: Charger: 220V/AC; Battery working time: 6-8hours
Stability: drift: 0.2uVºC (0-60ºC); zero drift: ≤0.1%/8 hours F/S
Calibration range: full-scale calibration
Working temperature: 0~+60ºC
Working Humidity: ≤80%
Allowed overload: 150%
Time setting up: 10-90 minutes
Power: AA nickel cyanide battery groups/ 220V/AC
Battery working time: 4-6 hours
Tags/penandaan: YYD-1